In relation to the absence of certain construction project completion and acceptance certificates, fire safety acceptance and planning verification documents, we have engaged third-party professional institutions to conduct site inspections, surveying, verification and other technical work, and are liaising with the relevant local authorities to complete rectification procedures or obtain substitute documents under current policies.
Specifically, as of the Latest Practicable Date, fifteen properties with an aggregate GFA of 2,689.6 sq.m., primarily as production auxiliary buildings or domestic living quarters, did not possess title certificates, and represent approximately 0.96% of our Group's completed building area (except for one property the certificate of which is being processed).
Business · 第 168 页
Our PRC Legal Advisor has provided a clear opinion on this matter, confirming that the absence of title certificates does not constitute a material violation of applicable laws or regulations.
Business · 第 168 页
Specifically, as of the Latest Practicable Date, fifteen properties with an aggregate GFA of 2,689.6 sq.m., primarily comprising production auxiliary buildings and domestic living quarters, did not possess title certificates.
As of June 30, 2026, we owned three properties in Chinese Mainland with an aggregate gross floor area (GFA) of approximately 536.0 sq.m.
Business · 第 163 页
As confirmed by our PRC Legal Advisor, we have obtained valid legal titles to these properties and land use rights for the land these buildings occupy, and we are entitled to legally occupy, use, benefit from, transfer, lease, mortgage or otherwise dispose of these properties.
As of the Latest Practicable Date, we owned 13 properties with an aggregate gross floor area of approximately 262,546 square meters in China and the U.S. We have obtained title certificates for all properties.
As of the Latest Practicable Date, we owned two properties in Chinese Mainland, with an aggregate GFA of approximately 430.91 sq.m., which are used as office premises. We have obtained the real property title certificates for these properties.
广西玉柴船电动力股份有限公司Guangxi Yuchai Marine and Genset Power Co., Ltd.
两处自建辅助设施未事先取得审批
In addition, as of the Latest Practicable Date, we had constructed a temporary storage shed (with an aggregate gross floor area of approximately 875 sq.m.) and a foundry ancillary room (with an aggregate gross floor area of approximately 520 sq.m.) (collectively, the ''Ancillary Facilities'') for which no prior approval had been obtained from the Yulin Natural Resources Bureau, the competent local authority.
Specifically, the registration procedures for workshops and offices owned by Hailiang Alltop, with a gross floor area of approximately 28,014 sq.m., could not be completed due to adjustments in local land planning use.
Business · 第 178 页
We have obtained a confirmation letter dated March 19, 2026 from the Tongling Shizishan High-tech Industrial Development Zone Planning and Construction Bureau confirming that the office building and ancillary facilities of our subsidiary Anhui Hailiang can continue to be used for production and operations and that no material non-compliance with land, planning, construction or real estate regulations has been identified.
Business · 第 178 页
Furthermore, the factories, R&D buildings, and other facilities owned by Gansu Hailiang, with a gross floor area of approximately 270,207 sq.m., are currently undergoing final acceptance procedures, and we will apply for the relevant certificates immediately upon the completion of such acceptance.
As of the Latest Practicable Date, we had obtained the relevant construction land planning permit (建設用地規劃許可證), construction planning permit (建設工程規劃許可證) and construction permit (建築工程施工許可證) from the government authorities for such property under construction.
As of June 30, 2026, our Company and Major Subsidiaries had several ancillary structures in China with an aggregate area of approximately 3,000 sq.m. which had not obtained title certificates, because certain construction approval procedures had not been completed during construction.
We did not obtain the relevant construction permit or complete the final acceptance filing for our decoration project at the manufacturing facilities in Yulin, Guangxi Zhuang Autonomous Region (the “Yulin Project”) and the decoration project at our Nanjing headquarters (the “Nanjing Project”).
Business · 第 186 页
During the Track Record Period, the relevant construction permit or complete the final acceptance filing for our decoration project at the manufacturing facilities in Yulin, Guangxi Zhuang Autonomous Region (the “Yulin Project”), with an aggregate investment amount of approximately RMB565,000.
Business · 第 200 页
the maximum aggregate penalty to which we may be exposed in respect of the Yulin Project and the Nanjing Project is approximately RMB1,011,300
As of the same date, our Company and Major Subsidiaries had one building in China, primarily for office use, with a gross floor area of approximately 44,612.60 sq.m. which had obtained the relevant underlying land title and construction approvals and had completed the construction completion filing.
Business · 第 152 页
As of the Latest Practicable Date, the application for this building’s title certificate was in process.
As confirmed by our PRC Legal Advisor, we had obtained valid legal titles to these properties and land use rights for the land occupied by these buildings, and that we are entitled to legally occupy, use, benefit from, transfer, lease, pledge or otherwise dispose of these properties.
As advised by our PRC Legal Advisers, we had obtained all the relevant property ownership certificates for the property we owned as required under the PRC laws and regulations during the Track Record Period and up to the Latest Practicable Date.