一处中国附属公司未完成排污登记或许可手续
公司的解释、律师意见及原文页码定位:在 Matters 中查看During the Track Record Period, one of our PRC subsidiaries had not completed certain pollutant discharge registration or permit procedures for their production premises.
Risk Factors · 第 39 页
港股IPO招股书披露先例 · 18 家公司,22 项
环境保护事项主要涉及环境影响评估、污染物排放许可、环保验收以及排放或废弃物违规受罚等情形。申请人一般在风险因素、业务、概要及财务资料等章节披露处罚的事实经过、罚款金额及整改进展,并说明已按时缴纳罚款、完成整改或取得主管部门确认,同时引述中国法律顾问认为相关事项不构成重大违规或法律风险较小的意见。
合规类事项自 2026 年 8 月 24 日起递交的文件开始收录。
公司的解释、律师意见及原文页码定位:在 Matters 中查看During the Track Record Period, one of our PRC subsidiaries had not completed certain pollutant discharge registration or permit procedures for their production premises.
Risk Factors · 第 39 页
We strictly comply with environmental laws and regulations in all our operating locations, including the Environmental Protection Law of the People’s Republic of China, the Water Pollution Prevention and Control Law of the People’s Republic of China, and the Law of the People’s Republic of China on the Prevention and Control of Environmental Pollution by Solid Waste, along with related regulations.
Business · 第 177 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看During the Track Record Period, the Company has not been subject to any administrative penalties or negative publicity related to environmental non-compliance.
Business · 第 177 页
We integrate environmental considerations into our manufacturing and operational processes and comply with applicable environmental laws and regulations in the jurisdictions where we operate in all material respects.
Business · 第 166 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看During the Track Record Period and up to the Latest Practicable Date, we were not subject to any material administrative penalties or prosecution in relation to violations of environmental laws and regulations.
Business · 第 166 页
In relation to our e-ink terminal device project, we did not file an environmental impact report for the lamination production lines prior to construction in June 2024.
Business · 第 184 页
In May 2026, the preparation of the environmental impact report was completed and approved by the competent authority, and the environmental protection acceptance procedures are expected to be completed by December 2026.
Business · 第 184 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看our PRC Legal Advisor is of the view that, under the premise that the existing policies and regulations, as well as the current regulatory situation and practical practices of the competent department of ecological environment, have not changed and there are no complaints, the risk of material administrative penalty in connection with it is low.
Business · 第 184 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看The Dabaoshan Mine has obtained EIA approvals for mining, processing and the tailings storage facility and has completed environmental protection acceptance as required, satisfying the national “three simultaneities” requirements.
Business · 第 139 页
During the Track Record Period, we were subject to administrative penalties in respect of two incidents of non-compliance relating to a factory.
Risk Factors · 第 28 页
Specifically, the automatic monitoring equipment at the RTO exhaust gas outlet of the RA Chemical factory was found to have not been operating properly during an inspection by the relevant government authority in June 2024, for which a fine of RMB20,000 was imposed.
Business · 第 148 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看In addition, the automatic monitoring data of the inorganic wastewater discharge outlet of the RA Chemical factory was found to have exceeded the permitted concentration limits, resulting in a fine of RMB352,000.
Business · 第 148 页
During the Track Record Period, the Sino Legend factory and BAE (Hubei) factory did not engage in over-capacity production exceeding 30% of the approved production capacity, over which could constitute a violation of laws or regulations or subject to administrative penalties.
Business · 第 125 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看Therefore, as advised by the PRC Legal Adviser, our Sino Legend factory and BAE (Hubei) factory were not required to undertake renewed environmental impact assessment procedures as a result of their over-capacity productions there.
Business · 第 125 页
Our PRC Legal Advisor has confirmed that, during the Track Record Period and up to the Latest Practicable Date, we had been in compliance with the PRC ESG-related laws and regulations in all material aspects.
Business · 第 178 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看Accordingly, our local counsel in Thailand and our local counsel in the U.S. are of the view that we had complied in all material respects with applicable environmental protection laws and regulations in Thailand and the U.S., respectively, relating to our production facility there during the Track Record Period and up to the Latest Practicable Date.
Business · 第 178 页
During the Track Record Period, some of our Group's projects have operated above their legal overloading limit when measured by the incineration input volume.
Business · 第 136 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看On this basis, our PRC Legal Advisor considers the legal risks arising from such overloading to be minimal and not expected to have any material adverse impact on our Group's operations.
Business · 第 137 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看Our Company has obtained all legally required permits and licences for air-emission, wastewater-discharge and solid-waste management under every applicable national and local regulation, and has not been subject to administrative penalties during the Track Record Period and up to the Latest Practicable Date.
Business · 第 173 页
During the Track Record Period and up to the Latest Practicable Date, as advised by our PRC Legal Advisor, we had complied with all applicable PRC laws and regulations in relation to social, health, safety and environmental matters in all material respects, and we had not been subject to any material claims, fines or other penalties due to non-compliance with PRC social, health, safety or environmental laws and regulations.
Business · 第 159 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看As we do not operate any production facilities, we are not subject to significant health, work safety, social or environmental risks.
Business · 第 162 页
Mic-Power New Energy Vietnam Company Limited (“Mic-Power Vietnam”) has obtained the environmental permit required for the operation of the Vietnam Production Base under applicable Vietnam environmental laws, being Environmental Permit No. 1288/GPMT-UBND (the “Permit”), on May 19, 2026.
Business · 第 198 页
During the period prior to obtaining the Permit, no administrative penalty, cessation order or other administrative decision was imposed on Mic-Power Vietnam in relation to the outstanding Permit.
Business · 第 198 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看As advised by our Vietnam Legal Advisor, the risk of the relevant authorities retroactively investigating the trial production activities conducted prior to obtaining the Permit and imposing penalties in respect of such trial production is relatively low, on the basis that the Company has already obtained the Permit.
Business · 第 198 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看Our Group has obtained the necessary environmental permits and licenses (such as pollutant discharge permits), and all construction projects have undergone environmental impact assessments as required.
Business · 第 193 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看During the Track Record Period and up to the Latest Practicable Date, we complied with all relevant environmental-related laws, regulations, and standards applicable in all material respects.
Business · 第 214 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看As confirmed by our PRC Legal Advisor, China has not yet implemented pollutant emission standards specifically targeting stationary diesel-fueled power generator engines.
Business · 第 110 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看The City Bureau for Ecosystem and Environment of Liaocheng fined Shandong Hailiang for RMB25,625 in April 2026 for improper operation of pollution processing facilities.
Business · 第 181 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看Our PRC Legal Advisors, our German Legal Advisors and Thai Legal Advisors, and our Directors have confirmed that, during the Track Record Period and up to the Latest Practicable Date, we had complied, in all material respects, with the applicable laws and regulations relating to environmental protection.
Business · 第 168 页
Our major PRC production subsidiaries have obtained pollutant discharge permits or conducted pollutant discharge registration.
Business · 第 167 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看The monitoring results indicated that our major pollutant emissions complied with the applicable national and local discharge standards during the corresponding reporting periods.
Business · 第 167 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看We have obtained the necessary environmental impact assessment report for our production facilities and construction completion and environmental protection acceptance reports for our R&D laboratories, demonstrating that our R&D and planned production facilities meet all relevant PRC environmental and regulatory standards concerning capacity, resource usage, and waste handling.
Business · 第 203 页
公司的解释、律师意见及原文页码定位:在 Matters 中查看During the Track Record Period and up to the Latest Practicable Date, we had been in compliance with health, work safety and environmental laws and regulations applicable to our operations in all material respects and had not been subject to any material claims, fines or other penalties due to non-compliance with health, work safety or environmental regulations that would materially and adversely affect our business, financial condition or results of operations.
Business · 第 212 页